Organizational Structure

Last Updated on: April 01, 2022

The Executive Engineer of the division is over all in-charge of the Division to look after the embankment, implementation of works etc. He is assisted by the Assistant Executive Engineers of the Sub divisions. The Assistant Executive Engineer is the in-charge of his Sub Division. He is assisted by the Assistant Engineers and Junior Engineers posted as sectional officer to look after the different sites. The Sectional Officer is assisted by the Sectional assistants posted under him.

The Barpeta W.R Division has three nos. of sub divisions :-

I. Barpeta W.R. Sub-Division:- Embankment, protection & Anti-erosion works along river Brahmaputra, Nakhanda, Morachaulkhowa and Bhellengi along with Harijan channel through Barpeta town also fall under the jurisdiction of this sub- Division.

II. Bajali W.R. Sub-Division:- Embankment, protection & Anti- erosion along river Pohumara and Kaldia fall under the jurisdiction of this Sub-Division. Helocha drainage channel and BisanNallah drainage channel also fall under this Sub-Division.

III. Sorbhog W.R. Sub-Division:- Embankment, protection & Anti –erosion works along river Manas and Beki fall under the jurisdiction of this Sub-Division.

Staff strength showing availability and vacancy of Barpeta W.R.Division:-

Sl No. Designation Strength Man in Position Vacancy

1

EE

1

1

Nil

2

Head Assistant

1

1

Nil

3

AEE(TC)

1

Nil

1

4

AEE

3

3

Nil

5

AE

4

4

Nil

6

A.O

1

1

Nil

7

Dy.A.O.

1

1

Nil

8

A.A.O.

3

1

2

9

J.E.

15

10

5

10

S.E. Gr-II

20

6

14

11

S.E. Gr-I

2

1

1

12

S.A.

70

52

18

13

U.D.A.

7

6

1

14

L.D.A.

12

10

2

15

Tracer

3

Nil

3

16

Driver

1

1

Nil

17

Khalashi

101

22

79